某汽车总装项目EPC总承包施工安全管理
  • 作者: 王晔志 关振刚 刘耀民
论文摘要
[摘要] 上汽通用五菱汽车(SGMW)西部工厂总装车间二期改造EPC总承包施工中,把“安全无事故”作为项目保证目标,根据分包商和作业工人的施工组织特点,建立健全了安全保证体系,重点在施工检查和安全教育上下功夫。在施工难度大、工期紧、安全风险高的情况下,保证了该项目安全建成投产。同时提出,工程总承包应把安全管理放在首位,要堵塞专业分包资质管理漏洞。
[关键词] 安全管理; 汽车总装; EPC总承包; 施工

Construction Safety Management of EPC General Contract in Some Automobile General Assembly Project

Abstract:In the engineering, procurement, construction (EPC) general contract of west fac
tory phase 2 general assembly project in SGMW, safety and no accident are considered as assured goal. According to the  construction organizations features of sub-contractors and workers, the safety assured system is established and perfected, and construction inspection and safety education are emphatically considered. The project is safely finished under the conditions of quite difficult construction, short construction time and high risks. And then, it is proposed
 that general contractor should pay the most attention to safety management and avoid the lim
itation in qualification management of professional sub-contractors.
Key words:safety management; automobile general assembly; EPC general contract; construction
主办单位:亚太建设科技信息研究院有限公司 中国建筑集团有限公司 中国土木工程学会    承办单位:施工技术传媒机构
京ICP备17044493号-16

京公网安备 110102000406-6
主编:张可文 电话:010-57368788   编辑部:010-57368789,010-57368790
广告、理事会:010-68300059,010-68330203,010-68341147   邮购及查询010-68341147  传真010-68300061
地址:北京市西城区德胜门外大街36号中国建设科技集团4层   邮编:100120        Email:sgjs@cadg.cn
施工技术网群鼓励技术交流,信息交流。群号:43883790    75228828    新浪微博:@施工技术传媒机构