装配式建筑建造全过程碳排放分析与研究
作者简介:
武 涛,工程师,E?mail:1186145772@ qq.com
作者单位:
中建三局集团有限公司,湖北 武汉 430064
摘要:
针对装配整体式剪力墙建筑建造过程中建材生产及运输、构件生产及运输、构件吊装、现场施工 6 个阶段, 构建装配整体式剪力墙建筑建造全过程碳排放预测模型. 基于武汉市某项目,对装配式建筑、现浇建筑建造全过 程碳排放量对比分析进行;计算装配式建筑建造各阶段的碳排放量,提出装配式建筑“减碳”策略与措施,为建筑工 程节能减排提供了新思路,能有效促进装配式建筑进一步“低碳”发展.

English:
Aiming at the six stages of building material production and transportation, prefabricated component production and transportation, lifting of components, and on?site construction, the carbon emission prediction model of the whole process of prefabricated shear wall building construction is constructed. Based on a prefabricated shear wall project in Wuhan, the carbon emissions of prefabricated buildings and cast?in?place buildings are compared and analyzed. The carbon emissions of prefabricated buildings are calculated at each stage of construction, and the strategies and measures for carbon reduction of prefabricated buildings are proposed, which provide new ideas for energy saving and emission reduction of construction projects and can effectively promote further “ low carbon ” development of prefabricated buildings.