基于 BIM+技术的顶模高空安装技术应用研究
作者简介:
祁 琪,工程师,E⁃mail:181622596@ qq. com
作者单位:
中建三局集团有限公司,湖北 武汉 430064
摘要:
为克服强台风地区超高层建筑建造难题,提高海南省超高层建筑顶模施工水平,在海南中心项目施工过程中,首次采用 BIM+技术,从顶模设计到安装阶段进行全流程优化,改善轻量化支点顶模集成平台安装工艺,实现轻量化支点顶模集成平台在复杂工况下的快速安装. 实践证明,该技术可有效降低顶模施工难度,显著提高安装安全性,缩短安装周期,提高工程质量.

English:
In order to overcome the construction problems of super high⁃rise buildings in strong typhoonareas and improve the construction level of top formwork of super high⁃rise buildings in Hainan Province,BIM + technology is adopted for the first time in the construction process of Hainan Center project. Thewhole process is optimized from the design stage to the installation stage of top formwork, and theinstallation process of lightweight fulcrum top formwork integrated platform is improved, so as to realizethe rapid installation of lightweight fulcrum top formwork integrated platform under complex workingconditions. Practice proves that this technology can effectively reduce the difficulty of top formworkconstruction, significantly improve the safety of installation, shorten the installation period, and improvethe quality of project.