富水软土地区盾构法联络通道施工环境影响分析
作者简介:
王书雄,工程师,E-mail: 2091454462@ qq. com
作者单位:
1.天津市地下铁道集团有限公司,天津 300392; 2.中国水利水电科学研究院,北京 100038;3.中铁第六勘察设计院集团有限公司,天津 300308; 4.天津大学,天津 300072;5.天津大学滨海土木工程结构与安全教育部重点实验室,天津 300072
摘要:
为克服传统冻结暗挖法联络通道施工对周边环境影响大的问题,依托天津地铁 10 号线某区间盾构法联络通道,通过 PLAXIS 3D 软件计算分析了盾构法联络通道施工对土层变形和周围建(构)筑物的影响规律。结果表明,联络通道施工完成后,土体最大沉降和隆起分别出现在联络通道正上方和正下方,沿联络通道轴线方向和横截面方向,地表沉降均表现为凹槽形。主隧道对相邻区域的土体变形有抑制作用,沿联络通道轴线方向,土体上部沉降及底部隆起均表现为距主隧道越远,变形越明显的简支梁式分布。联络通道施工使主线隧道上方地表累计沉降增加,对盾构机始发段的主线隧道影响很大。联络通道变长会加大施工影响范围,增加最大地表沉降值,但影响范围和增长速率随联络通道变长而减小。

English:
To overcome the problem of significant impact on the surrounding environment during theconstruction of the traditional frozen underground excavation method for the connecting passage, based onthe shield method connecting passage in a certain section of Tianjin Subway Line 10, the influence of theshield method connecting passage construction on soil deformation and surrounding buildings was analyzedthrough PLAXIS 3D software. The results show that, after the completion of the connecting passageconstruction, the maximum settlement and uplift of the soil occur directly above and below the connectingpassage, respectively. Along the axis and cross-section directions of the connecting passage, the surfacesettlement shows a trough shape. The main tunnel has an inhibitory effect on the soil deformation in theadjacent area. Along the axis direction of the connecting passage, the settlement of the upper part of thesoil and the uplift of the lower part show a simply supported beam distribution,with more obviousdeformation as the distance from the main tunnel increases. The construction of the connecting passageincreases the cumulative surface settlement above the main line tunnel, and has a greater impact on themain line tunnel at the shield machine’s starting section. The lengthening of the connecting passage will increase the construction impact range and the maximum surface settlement value, but the impact rangeand growth rate will decrease as the connecting passage lengthens.