摘要:

为解决公路隧道病害处治难题,以某高速公路隧道为工程实例,采用工程类比法及数值模拟方法,对隧道仰拱开裂、初支变形及二衬开裂原因进行了分析,提出了适合的病害处治技术,并对提出的洞内加固技术进行了细化设计和研究。结果表明:地形偏压造成的不均匀沉降是引起隧道初支变形、仰拱及二衬开裂的重要原因,同时岩质软弱、岩层富水和地质构造发育也是造成隧道初支变形、仰拱及二衬开裂的重要影响因素,三者耦合相互作用造成上覆围岩进一步劣化,加剧了衬砌结构病害的发展程度;隧道洞内加固方案可避免大开大挖,施工简单且造价低,通过合理的洞内加固措施可很好地解决隧道仰拱开裂、初支变形及二衬开裂问题。采用有限元软件建模并计算了洞内加固方案,其计算结果验证了该方案的安全性和可行性。

English:

In order to solve the problem of highway tunnel disease treatment, taking a highway tunnel asan engineering example, the causes of inverted arch filling cracking, the initial support deformation andthe secondary lining cracking are analyzed by using engineering analogy method and numerical simulationmethod. The suitable disease treatment technology is proposed, and the proposed tunnel reinforcementtechnology is detailed designed and studied. The results show that: Uneven settlement caused by terrainbias is an important cause of tunnel initial support deformation, inverted arch filling and secondary liningcracking; Meanwhile, rock weakness, rock strata rich in water and geological structure development arealso important influencing factors of tunnel initial support deformation, inverted arch filling and secondarylining cracking. The coupling interaction of which causes further deterioration of overlying surroundingrock and aggravation of lining structure diseases; The tunnel reinforcement scheme can avoid largeexcavation, and the construction is simple and the cost is low, and the scheme can effectively solve theproblems of tunnel inverted arch filling cracking, initial support deformation and secondary liningcracking through reasonable reinforcement measures. The finite element software is used to model andcalculate the reinforcement scheme in the tunnel, and the calculation results verify the safety andfeasibility of the scheme.