应用研究 2025年 第卷 第18期

DOI: 10. 7672 / sgjs2025180130

陆上风电机组塔筒吊装施工监测技术

李刚

作者简介:

李刚,高级工程师,E-mail:364497192@ qq. com

作者单位:

中电建新能源集团股份有限公司南方分公司,广东广州 510800

摘要:

随着陆上风电机组的功率增大,塔筒高度随之增大,塔筒吊装施工难度也相应增大。以甘肃省酒泉市肃北县一处风电场建设为例,重点针对风电塔筒吊装施工过程中吊装平台地基承载力、塔筒辅助起重机抬吊卸车及主辅起重机安装校核计算进行分析,并针对塔筒吊装过程中主起重机吊装性能开展动态监测,有效保障风电塔筒吊装施工作业安全性和施工精度。

English:

With the increase of the power of the onshore wind turbine, the height of the tower increases,and the difficulty of the tower hoisting construction increases accordingly. Taking the construction of awind farm in Subei County, Jiuquan City, Gansu Province as an example, this paper focuses on thefoundation bearing capacity of the hoisting platform, the lifting and unloading of the tower auxiliary craneand the installation and checking calculation of the main and auxiliary cranes during the hoistingconstruction of the wind power tower. The dynamic monitoring of the hoisting performance of the maincrane during the tower hoisting process is carried out,which effectively guarantees the safety andconstruction accuracy of the hoisting construction of the wind power tower.