桥梁工程 2026年 第卷 第02期

DOI: 10.7672 / sgjs2026020025

大跨径上承式钢箱拱桥荷载试验研究

康源¹,张小宇²,许蔚²,吴永红²,黄辉³

作者简介:

康源,高级工程师,E-mail:710597035@ qq. com

作者单位:

1.中国水利水电第十四工程局有限公司,云南昆明 650500;2.昆明理工大学建筑工程学院,云南昆明 650500;3.德阳天元重工股份有限公司,四川德阳 618000

基金项目:

∗国家自然科学基金(52369023)

摘要:

澜沧江特大桥是主跨为 300m 的上承式钢箱拱桥,为研究该桥运营状态下的承载力以及最不利工况下结构的力学性能,对其进行成桥荷载试验。根据桥梁最不利受力状态选择控制截面,在静载作用下测试各个控制截面的挠度、应变;通过脉动试验、行车试验、跑车试验测试其固有频率、阻尼比、冲击系数、行车响应等参数,并对比分析试验数据与理论计算数据。结果表明:静载作用下,结构整体在各工况下的挠度、应变校验系数及相对残余变形、应变均满足规范要求,控制测点的相对残余应变和残余变形均有富余;在动载试验中,冲击系数为 0.02 —— 0.03,自振频率实测值大于计算值,阻尼比<5%.该桥工作状况处于弹性范围,桥梁实际强度、刚度和承载力满足设计及相关规范要求。

English:

The Lancang River Grand Bridge is a top-bearing steel box arch bridge with a main span of300 meters. To study its load-bearing capacity under operational conditions and structural performanceunder the most unfavorable working conditions, load tests were conducted on the completed bridge.Control sections were selected based on the bridge’ s most unfavorable stress states, and deflection andstrain measurements were taken at these sections under static loading. Parameters such as naturalfrequency, damping ratio, impact factor, and dynamic response were tested through pulse tests,vehicletraffic tests, and moving load tests. The experimental data was then compared and analyzed againsttheoretical calculations. The results indicate that under static loading, the deflection and strainverification coefficients of the structure across all working conditions, as well as relative residualdeformation and strain, meet the requirements of the specifications. The relative residual strain anddeformation at the control measurement points exhibit significant surplus. During dynamic load tests, theimpact factor ranged between 0.02 and 0.03, the measured natural frequency exceeded the calculatedvalue, and the damping ratio was less than 5%. The bridge’ s working condition falls within the elasticrange, and its actual strength, stiffness, and load-bearing capacity complywith design and relevant coderequirements.