岩土与地下工程 2026年 第卷 第07期

DOI: 10. 7672 / sgjs2026070031

天津软土地区深基坑变形特性实测与模拟分析

李石磊

作者简介:

李石磊,工程师,E⁃mail:1304725793@ qq. com

作者单位:

中铁十八局集团第三工程有限公司,河北 涿州 072750

基金项目:

∗中铁十八局集团有限公司 2024 年度科研创新项目(2024⁃031)

摘要:

依托天津滨海新区东海路排水管网改造工程基坑开挖施工,开展现场监测和数值模拟,分析基坑围护桩桩体水平位移和地表沉降的发展规律,研究不同桩径、桩间距和嵌固深度对基坑变形特性的影响. 结果表明,围护桩桩体水平位移随开挖深度的增大而增大,沿深度方向先增大后减小,深度 10m 处的桩体水平位移最大. 基坑长边处桩体水平位移比短边处更大. 基坑开挖过程中地表以沉降为主,地表沉降最大值在距离基坑边缘 7.5m 处产生.当距离基坑边缘超过 30m 时,地表基本不发生沉降. 围护桩桩径和嵌固深度增加使得桩体水平位移和地表沉降减小,桩间距增大使得桩体水平位移和地表沉降变大. 当围护桩桩径为 1 200 ~ 1 400mm、桩间距为 1 000 ~ 1 500mm、3 层结构段和 5 层结构段围护桩嵌固深度分别不小于 4m 和 2.5m 时,对基坑变形控制效果较好.

English:

Based on excavation construction of the Donghai Road Drainage Pipe Network ReconstructionProject in the Tianjin Binhai New Area, on⁃site monitoring and numerical simulation were carried out toanalyze the development law of horizontal displacement and surface settlement of foundation excavationretaining pile, and to study the influence of different pile diameter, pile spacing and embedded depth onthe deformation characteristics of foundation excavation. The results indicate that the horizontaldisplacement of the retaining pile increases with the increase in the excavation depth, increasing first andthen decreasing along the depth direction, and the horizontal displacement of the pile at the depth of 10mis the largest. The horizontal displacement of the pile at the long side of the foundation excavation islarger than that at the short side. During the excavation, the surface settlement is dominant, and themaximum surface settlement is generated at a distance of 7. 5m from the edge of the foundationexcavation. When the distance from the edge of the foundation excavation is more than 30m, basically nosurface settlement occurs. The increase in pile diameter and embedded depth of retaining pile reduces thehorizontal displacement of pile and surface settlement, and the increase in pile spacing makes thehorizontal displacement of pile and surface settlement larger. When the pile diameter of the retaining pileis 1 200~1 400mm, the pile spacing is 1 000~1 500mm, and the embedded depth of the retaining pilein the three⁃layer structure section and the five⁃layer structure section is not less than 4m and 2. 5m,respectively, the deformation of the foundation excavation can be well controlled.