空孔数量对隧道直孔掏槽爆破效果影响研究

王 亚¹,覃继华¹,程 兵²’³’⁴,叶 福²,曹效礼¹,赵 波¹,苏 洪²’⁴,李洪伟²’⁴

作者简介:

王 亚,工程师,E⁃mail: 815386308@ qq. com

作者单位:

1. 中铁十局集团有限公司,山东 济南 250010; 2. 安徽理工大学化工与爆破学院,安徽 淮南 232001;3. 安徽理工大学矿山地下工程教育部工程研究中心,安徽 淮南 232001; 4. 安徽理工大学安徽省新型爆炸材料与爆破技术工程研究中心,安徽 淮南 232001

基金项目:

∗安徽省自然科学基金(2408085QA029);矿山地下工程教育部工程研究中心开放基金(JYBGCZX2023105)

摘要:

为了获取隧道直孔掏槽爆破的最佳空孔数量,采用显式动力分析平台 ANSYS / LS⁃DYNA 开展不同空孔数量下的直孔掏槽爆破数值模拟,对比分析空孔数量对直孔掏槽爆破效果的影响,并通过现场爆破试验探究其实际应用效果. 结果显示:随着空孔数量的增加,直孔掏槽爆破的成腔面积逐渐增大,当空孔数量 N = 3,4,5,6,8 时,成腔面积分别为 1 424,1 595,1 724,1 833,1 917cm2;成腔面积提升率随空孔数量的增加而减小,当空孔数量从 6 增加到 8 时,成腔面积仅提高了 4.58%,综合考虑爆破成本和爆破效果,建议直孔掏槽爆破使用 6 个空孔;在现场试验中采用 6 个空孔时,炮孔利用率为 94.3%、周边孔孔痕率为 86.1%,试验结果证实了空孔数目 N = 6 的工程适用性.

English:

To obtain the optimal number of empty holes for parallel cutting in tunnels, the explicitdynamic analysis platform ANSYS / LS⁃DYNA was used to conduct numerical simulations of parallelcutting blasting under different numbers of empty holes to compare and analyze the influence of thenumber of empty holes on the blasting effects of parallel cutting, and explore its practical applicationeffects through field experiments. The results showed that with the increase of the number of empty holes,the cavity area of parallel cutting blasting increased gradually. When the number of empty holes N = 3,4, 5, 6, 8, the cavity areas was 1 424, 1 595, 1 724, 1 833, 1 917cm2, respectively. However, theincrease rate of cavity area could gradually decrease with the increase of the number of empty holes.When the number of empty holes increases from 6 to 8, the cavity area only increased by 4.58%.Considering the blasting cost and blasting effect comprehensively, it was recommended to use 6 emptyholes in the parallel cutting blasting. In the field experiment, the hole utilization rate of 94. 3% andperipheral hole mark rate of 86. 1% were obtained when 6 empty holes were adopted, which confirmed the engineering applicability of the numbers of empty holes N= 6.