Information 2025.Vol No.24

Citation:DOI: 10.7672 / sgjs2025240064

Efficient Material Transportation System for Small⁃diameter TBM Construction in Drainage System of Pumped Storage Power Station

WU Zonglin¹, LI Hansong¹, HU Tianhao¹, LIU Longfei²

About the author:

1. Sinohydro Bureau 7 Co.,Ltd.,Chengdu, Sichuan 611730,China;2. Sichuan Tongfa Guangjin Human Resources Management Consulting Co.,Ltd.,Chengdu, Sichuan 610041,China

Abstract:

In recent years, China􀆳s pumped storage field has experienced booming development,withsmall⁃diameter TBM construction gradually being adopted in the drainage system of pumped storage powerstation. However, little information has been published on efficient and coordinated materialtransportation for TBM in tunnel characterized by small diameters, tight curves, multiple bends, and longdistances in these drainage systems. As one of the critical factors influencing TBM construction, efficientmaterial transportation systems are compared based on practical application effects in completed pumpedstorage power station projects utilizing small⁃diameter TBM in drainage systems. This comparative analysisexamines the adaptability and efficiency of track⁃based transportation, trackless transportation, andcontinuous conveyor system, ultimately summarizing the selection of matching efficient materialtransportation systems for small⁃diameter TBM application in drainage systems under varying conditions.Although the use of a single transportation method is feasible considering various on⁃site constraints, acombination of two or more methods mayyield optimal results.