钢结构 2025年 第卷 第20期

DOI: 10.7672 / sgjs2025200029

某国际机场航站楼大悬挑大矢高网架施工技术

王建桥,许华姣,叶冬晨,丁 毅,卢福生

作者简介:

王建桥,资深交付经理,高级工程师,E-mail:wangjqiao@ jgsteel. cn

作者单位:

浙江精工钢结构集团有限公司,浙江 绍兴 312030

摘要:

针对西宁曹家堡国际机场航站楼钢屋盖高差大、南侧网架悬挑区受高架桥施工工作面干涉且存在大量铸钢节点等施工技术难题,开展创新性研究。 针对钢结构旋转提升过程中的水平偏移问题,系统分析网架水平偏移机理,并提出理论模型及简化计算方法;针对施工工作面干涉问题,提出滑移-提升组合施工工艺,同时创新性地设计一种等强连接节点,通过延长焊缝搭接长度实现荷载分流,达到不同强度钢构件间的等强连接。 通过有限元数值模拟和加载试验对理论模型和新型节点进行验证。 结果表明:旋转提升网架水平偏移理论计算值与有限元分析结果吻合良好,偏差仅 6%;滑移-提升组合施工工艺有效解决了机场大悬挑区施工受高架桥施工工作面干涉的问题,确保了工程安全高效施工;新型连接节点满足等强连接要求,拉伸试件断裂点均发生在母材区域而非连接薄弱处。

English:

In response to the technical challenges of the steel roof of Xining Caojiapu InternationalAirport, such as the large height difference of the steel roof, interference from the construction face ofviaduct in the southern grid frame cantilever area, as well as a large number of cast steel joints, a seriesof innovative studies were carried out. Aiming at the problem of horizontal migration of steel structure inthe process of rotating lifting, the mechanism of horizontal migration of grid frame is analyzedsystematically for the first time, and the theoretical model and simplified calculation method areproposed. To address the interference problem of the construction face, a combined construction methodof slipping-lifting was proposed. An innovative equal-strength cast steel joint was designed, whichachieved load distribution by extending the weld lap length, thus realizing the equal-strength connectionbetween steel components of different strengths. The theoretical model and the new type of cast steel jointwere verified through finite element numerical simulation and loading tests. The results show that thetheoretical calculation value of the horizontal migration of grid fame in the rotating lifting process is ingood agreement with the finite element analysis results, with a deviation of only 6%. The combinedconstruction method of slipping-lifting effectively solved the problem of interference from the constructionface of viaduct in the construction of large overhang area of the airport, ensuring the safe and efficientprogress of the project. The new connection joint meets the requirements of equal-strength connection inthe specifications, and the fracture points of the tensile specimens all occurred in the base material arearather than at the connection weak points.