DOI: 10.7672 / sgjs2025200123
The new project is very important for the deformation control and safety assessment of adjacentexisting structures. Based on the project of Chongqing Jiangbei International Airport T3B terminal and thefourth runway, the influence of the new parking building and ramp bridge on the adjacent existing railtransit structure is analyzed by 3D numerical simulation method, and then the corresponding rail transitprotection measures are formulated. Using MIDAS GTS NX numerical simulation software, thedisplacement influence of the new project on the anchor pile retaining wall and the viaduct structure of theexisting Rail Transit Line 15 construction channel and the Rail Transit Line 10 is quantitatively analyzed,and the safety of the proposed project and the existing rail transit structure is evaluated. The results showthat the new parking building and ramp bridge have little impact on the existing rail transit structure andthe risk is controllable.