基坑双排管桩与盖板接头承载特性试验研究
作者简介:
徐梓舒,硕士,助理工程师,Email:xuzishu1021@163.com
作者单位:
(1.广东省建设工程质量安全检测总站有限公司,广东广州510500;2.广东省建筑科学研究院集团股份有限公司,广东广州510500)
摘要:
珠江三角洲某双排管桩基坑支护结构,在基坑开挖过程中发现盖板出现沿基坑边线方向开展的裂缝。为深入研究基坑开挖后双排管桩与盖板相互影响的承载特性、开裂原因及裂缝控制措施,采用缩尺模型试验进行研究,并根据不同荷载工况及提出的改良措施,分析了管桩与盖板连接处的应力分布和变化规律,探讨盖板开裂的原因。研究结果表明:管桩顶部与盖板连接位置强度较弱,应力峰值分别出现在管桩与盖板连接处的前侧表面与上方表面。盖板开裂的直接原因在于管桩结构发生较大变形,由节点连接处传递变形迫使盖板开裂;通过调整管桩桩顶锚入盖板深度与采用暗梁钢筋布置两项改良措施,可起到有效降低应力、控制裂缝的作用。

English:
A doublerow pipe pile foundation excavation supporting structure in the Pearl River Delta was found to have cracks along the edge of the foundation excavation during its excavation. To further study the bearing characteristics, cracking causes, and crack control measures of the interaction between the doublerow pipe pile and the cover plate after the excavation of the foundation excavation, the scale model test was used to study the project. According to the different load conditions and the proposed improvement measures, the stress distribution and variation law of the connection between the pipe pile and the cover plate were analyzed, and the cause of the cover plate cracking was discussed. The results indicate that the strength of the connection between the top of the pipe pile and the cover plate is weak, and the peak stress appears on the front surface and the upper surface of the connection between the pipe pile and the cover plate, respectively. The direct reason for the cracking of the cover plate is that the pipe pile structure has a large deformation, and the deformation transmitted by the joint connection forces the cover plate to crack. The stress can be effectively reduced and the cracks can be controlled by adjusting the depth of the top anchor of the pipe pile into the cover plate and using the arrangement of the hidden beam reinforcement.